{"id":1140,"date":"2019-05-06T16:20:09","date_gmt":"2019-05-06T15:20:09","guid":{"rendered":"http:\/\/www.ubuild.es\/casa-o-soutino-parte-10\/"},"modified":"2021-09-04T21:36:17","modified_gmt":"2021-09-04T20:36:17","slug":"casa-o-soutino-parte-10","status":"publish","type":"post","link":"https:\/\/www.ubuild.es\/en\/casa-o-soutino-parte-10\/","title":{"rendered":"prefabricated house o souti\u00f1o part 10"},"content":{"rendered":"<h2>placing the panels of the floor<\/h2>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1038\" src=\"http:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/01.1.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/01.1.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/01.1-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/01.1-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/01.1-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/01.1-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/01.1-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/01.1-750x422.jpg 750w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/01.1-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p>After placing the transversal beams of the structure we\u00b4ll start setting the panels that will shape the floor of the house.\u00a0 First,<strong> inferior panels<\/strong> will be screwed on the beams of the floor and second, the <strong>floor isolation<\/strong> of <strong>15 cm<\/strong> will be placed over these panels and between the beams. Third, <strong>superior panels<\/strong> will be leant and screwed on the beams.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1041\" src=\"http:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/03.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/03.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/03-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/03-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/03-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/03-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/03-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/03-750x422.jpg 750w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/03-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p>The panels and pillars are placed on the platform in order to make the mounting easier and faster. The panels lean on between and over the beams. We\u00b4ve got the exact space so that everything fits in with the <strong>minimum slack between the pieces.<\/strong><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1043\" src=\"http:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/04.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/04.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/04-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/04-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/04-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/04-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/04-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/04-750x422.jpg 750w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/04-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p>Once all the elements are placed they will <strong>be screwed one on another to give rigidity and resistance to the set<\/strong>.\u00a0 As different pieces of the construction are united by screwing the set becomes more and more resistant and finally it is an <strong>undeformable unit.<\/strong><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1045\" src=\"http:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/02.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/02.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/02-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/02-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/02-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/02-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/02-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/02-750x422.jpg 750w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/02-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<h2>the pillars are fitted in the beams of the floor<\/h2>\n<p>The horizontal platform is ready. Now it\u00b4s time to <strong>fit the pillars in the beams of the floor<\/strong>, which can be done incredibly fast and easily. We need to keep assembling the basic structure of the house.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1061\" src=\"http:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/12.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/12.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/12-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/12-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/12-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/12-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/12-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/12-750x422.jpg 750w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/12-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1059\" src=\"http:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/09.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/09.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/09-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/09-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/09-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/09-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/09-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/09-750x422.jpg 750w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/09-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1047\" src=\"http:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/IMG_20190305_125709.jpg\" alt=\"\" width=\"4000\" height=\"3000\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/IMG_20190305_125709.jpg 4000w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/IMG_20190305_125709-300x225.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/IMG_20190305_125709-768x576.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/IMG_20190305_125709-1024x768.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/IMG_20190305_125709-350x263.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/IMG_20190305_125709-1140x855.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/IMG_20190305_125709-750x563.jpg 750w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/IMG_20190305_125709-278x209.jpg 278w\" sizes=\"auto, (max-width: 4000px) 100vw, 4000px\" \/><\/p>\n<h2>the beams of the ceiling complete the basic structure of the house<\/h2>\n<p>We start fitting the beams of the house cover in the pillars. Everything has been studied so that the beams directly fit in the pillars and the beams in one another, <strong>only by fitting in and screwing<\/strong>. We have to mount another platform, but this time it\u00b4ll be inclined because the roof of the house is inclined too.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1051\" src=\"http:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/06.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/06.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/06-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/06-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/06-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/06-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/06-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/06-750x422.jpg 750w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/06-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p>The beams are being fitted in in order to ensemble\u00a0 the joists of the roof.\u00a0 As you can see in the southern side of the roof, the beams have got some <strong>wood emptying<\/strong> that will be used to put a <strong>large cantilever<\/strong> to protect the house from strong sunning that Orense is exposed to in summer time. Ubuild can give special and personal solutions to any house wherever it is ensembled.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1064\" src=\"http:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/13.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/13.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/13-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/13-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/13-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/13-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/13-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/13-750x422.jpg 750w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/13-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1054\" src=\"http:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/07.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/07.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/07-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/07-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/07-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/07-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/07-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/07-750x422.jpg 750w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/07-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p>Now it\u00b4s possible to observe the volume of the new house from the principal village road. <strong>The beams and the pillars have been ensembled<\/strong>.\u00a0 Everything is ready for fitting in them the rest of the constructive elements that will form the house.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1056\" src=\"http:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/08.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/08.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/08-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/08-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/08-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/08-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/08-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/08-750x422.jpg 750w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/05\/08-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p>We\u00b4ll keep on explaining all the process of mounting this house. To be continued\u2026<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The horizontal platform of the house must be finished in order to be able to assemble the pieces comfortably. We want to finish with all the exterior part as soon as possible to avoid problems with rain, as the weather forecast has changed. We are in Galicia.<\/p>\n","protected":false},"author":1,"featured_media":1056,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[551],"tags":[1535,1210,1631,1632,716,1263,715,1630,717,1317,712,1627,1629,1264,1215,1318,1309,1238,1633,1628],"yst_prominent_words":[1261,1259,1246,834,1254,1256,1255,798,601,1239,1185,1260,1258,832,833,1253,364,602,1262,587],"class_list":["post-1140","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction","tag-alberto-corral-en","tag-bioclimatic-architecture","tag-construction-of-wooden-houses","tag-construction-system","tag-ecological-architecture","tag-ecological-house","tag-green-architecture","tag-green-house","tag-mobile-house","tag-modular-architecture","tag-modular-house","tag-prefabricated-architecture","tag-premade-house","tag-self-construction","tag-sustainable-architecture","tag-sustainable-house","tag-tiny-house-2-en","tag-ubuild-en","tag-wooden-construction-system","tag-wooden-house"],"_links":{"self":[{"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/posts\/1140","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/comments?post=1140"}],"version-history":[{"count":5,"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/posts\/1140\/revisions"}],"predecessor-version":[{"id":2330,"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/posts\/1140\/revisions\/2330"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/media\/1056"}],"wp:attachment":[{"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/media?parent=1140"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/categories?post=1140"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/tags?post=1140"},{"taxonomy":"yst_prominent_words","embeddable":true,"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/yst_prominent_words?post=1140"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}