{"id":1144,"date":"2019-06-13T18:51:50","date_gmt":"2019-06-13T17:51:50","guid":{"rendered":"http:\/\/www.ubuild.es\/casa-o-soutino-parte-11\/"},"modified":"2021-09-04T21:35:36","modified_gmt":"2021-09-04T20:35:36","slug":"casa-o-soutino-parte-11","status":"publish","type":"post","link":"https:\/\/www.ubuild.es\/en\/casa-o-soutino-parte-11\/","title":{"rendered":"ecological house o souti\u00f1o part 11"},"content":{"rendered":"<h2>placing the basic panel of the fa\u00e7ade<\/h2>\n<p>The <strong>basic element of the fa\u00e7ade is a phenolic panel<\/strong> which stands exterior weather conditions without any problem. It will be directly screwed on the beams and pillars making the structure more rigid. From this panel on the fa\u00e7ade will grow towards inside with the interior fa\u00e7ade modules or towards outside with the ventilated fa\u00e7ade modules. In our particular case the basic panel has already been prepared to hang up the ventilated fa\u00e7ade modules. If the ventilated fa\u00e7ade is not desired in the beginning, it will be able to be added later on without any problem.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1078\" src=\"http:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-17.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-17.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-17-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-17-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-17-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-17-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-17-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-17-750x422.jpg 750w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-17-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p>In these two pictures you can see how one of the phenolic panels is being placed in the fa\u00e7ade. Later the<strong> beams and pillars will be screwed in the remaining gap<\/strong>.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1080\" src=\"http:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-18.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-18.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-18-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-18-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-18-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-18-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-18-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-18-750x422.jpg 750w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-18-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p>In the photo below you can see the basic panels from the outside of the building. The ventilated fa\u00e7ade will be laid over them. This is the moment to place the doors and the windows of the fa\u00e7ade, too.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1082\" src=\"http:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-14.2.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-14.2.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-14.2-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-14.2-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-14.2-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-14.2-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-14.2-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-14.2-750x422.jpg 750w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-14.2-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<h2>ensembling the roof<\/h2>\n<p>Once the facade is rigid we start setting the joists of the roof. When <strong>fitting in and screwing the joists in the beams of the ceiling<\/strong>, the volume of the house becomes very resistant.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1084\" src=\"http:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-15.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-15.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-15-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-15-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-15-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-15-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-15-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-15-750x422.jpg 750w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-15-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1086\" src=\"http:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-19.2.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-19.2.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-19.2-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-19.2-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-19.2-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-19.2-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-19.2-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-19.2-750x422.jpg 750w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-19.2-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p>When all the joist of the roof are placed, a <strong>DM panel<\/strong> is fitted in the inferior part of them. The isolation of the roof is placed over the DM panel.\u00a0 All over the house the floor and the walls have an <strong>isolation of 15 cm of rock wool,<\/strong> as you can see in the photo below.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1088\" src=\"http:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-22.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-22.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-22-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-22-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-22-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-22-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-22-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-22-750x422.jpg 750w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-22-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p>As the isolation is being placed, a <strong>superior panel, OSB of 20 mm<\/strong>, is also being placed in the roof. A perfect inclined plane is formed and tracks are placed over this plane to create an <strong>air chamber in the roof<\/strong>. In the pictures below you can see how the panels OSB are brought to the roof and how the air chamber is formed.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1090\" src=\"http:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-21.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-21.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-21-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-21-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-21-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-21-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-21-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-21-750x422.jpg 750w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-21-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1102\" src=\"http:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-21.1-1.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-21.1-1.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-21.1-1-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-21.1-1-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-21.1-1-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-21.1-1-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-21.1-1-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-21.1-1-750x422.jpg 750w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-21.1-1-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<h2>ensembling the modules of the ventilated fa\u00e7ade<\/h2>\n<p>In this house the <strong>ventilated fa\u00e7ade<\/strong> is composed of a wooden substructure and surface finish in viroc, a <strong>panel of wood-cement<\/strong>. Each module is hung up from the basic panel of the fa\u00e7ade and it is screwed in the beam of the ceiling. The <strong>module of the ventilated fa\u00e7ade creates an air chamber with the basic panel.<\/strong> This air chamber can be either open or closed, performing as an <strong>isolation chamber in winter or ventilation chamber in summer<\/strong>. The reason why we have chosen wood-cement material in the surface finish is to integrate the house better in the rural nucleus, where all the houses are made of stone and because there are many stone walls and powerful rocks in the immediate environment.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1095\" src=\"http:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-23.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-23.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-23-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-23-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-23-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-23-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-23-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-23-750x422.jpg 750w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-23-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1130\" src=\"http:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-25.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-25.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-25-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-25-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-25-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-25-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-25-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-25-750x422.jpg 750w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-25-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<h2>ensembling the interior modules of the fa\u00e7ade<\/h2>\n<p>Now the house is protected from wind and rain and we start placing the interior modules of the fa\u00e7ade. The <strong>module<\/strong> is composed of a <strong>panel of okume of 4 mm<\/strong>, which protects the <strong>15-cm-thick isolation of rock wool<\/strong> inside of it. This is finished with a <strong>panel of 15 mm, which can have any interior finishing material<\/strong>. In this case the clients want to paint the walls and that\u00b4s why this panel is DM waterproof. When setting the interior module of the fa\u00e7ade over the basic panel <strong>another air chamber of 3 cm is formed<\/strong>.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1107\" src=\"http:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-30.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-30.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-30-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-30-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-30-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-30-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-30-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-30-750x422.jpg 750w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-30-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1105\" src=\"http:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/IMG_7810.jpg\" alt=\"\" width=\"4272\" height=\"2848\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/IMG_7810.jpg 4272w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/IMG_7810-300x200.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/IMG_7810-768x512.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/IMG_7810-1024x683.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/IMG_7810-350x233.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/IMG_7810-1140x760.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/IMG_7810-750x500.jpg 750w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/IMG_7810-278x185.jpg 278w\" sizes=\"auto, (max-width: 4272px) 100vw, 4272px\" \/><\/p>\n<h2>modules of the interior partition wall<\/h2>\n<p>Partition walls of the inside are also modules and they are made of <strong>DM panels of 10 mm with 8 cm of isolation between two panels.<\/strong> These modules are united together by some wooden pieces which allow passing installations inside of them. In this first picture we can see some modules of the partition walls receiving isolation material in the factory.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1110\" src=\"http:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-42.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-42.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-42-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-42-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-42-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-42-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-42-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-42-750x422.jpg 750w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-42-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p>In the following photos you can see how the partition wall is set. First, <strong>fitting it in between the interior modules of the fa\u00e7ade and the joists of the ceiling<\/strong>, and second,\u00a0 fitting them in together by a union piece.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1133\" src=\"http:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-35.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-35.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-35-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-35-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-35-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-35-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-35-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-35-750x422.jpg 750w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-35-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1112\" src=\"http:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-36.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-36.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-36-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-36-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-36-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-36-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-36-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-36-750x422.jpg 750w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-36-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1114\" src=\"http:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-39.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-39.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-39-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-39-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-39-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-39-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-39-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-39-750x422.jpg 750w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-39-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1119\" src=\"http:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-41.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-41.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-41-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-41-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-41-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-41-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-41-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-41-750x422.jpg 750w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2019\/06\/1920-41-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p>Once all the interior partition wall has been placed it\u00b4s time to start to pass all installations through the huge amount of space that has been reserved for them. You\u00b4ll see how the installations will be accessible in any section not needing to touch facades, floor, ceiling nor interior partition walls. To be continued\u2026.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The structure, the skeleton of the house, is ensemble.  Now we\u00b4ll start with the components of the fa\u00e7ade and with the roof. All the elements have got their space in the forms of the beams and the pillars. We only need to select the constructive elements and set them in the logical order that is visible in the forms of the beams and pillars. There is no range for a mistake.<\/p>\n","protected":false},"author":1,"featured_media":1075,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[551],"tags":[1535,1210,1631,1632,716,1263,715,1630,717,1317,712,1627,1629,1264,1215,1318,1309,1238,1633,1628],"yst_prominent_words":[1282,604,842,843,1288,844,841,1270,1266,1281,850,851,1289,1287,1272,1136,1273,643,1278,1290],"class_list":["post-1144","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction","tag-alberto-corral-en","tag-bioclimatic-architecture","tag-construction-of-wooden-houses","tag-construction-system","tag-ecological-architecture","tag-ecological-house","tag-green-architecture","tag-green-house","tag-mobile-house","tag-modular-architecture","tag-modular-house","tag-prefabricated-architecture","tag-premade-house","tag-self-construction","tag-sustainable-architecture","tag-sustainable-house","tag-tiny-house-2-en","tag-ubuild-en","tag-wooden-construction-system","tag-wooden-house"],"_links":{"self":[{"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/posts\/1144","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/comments?post=1144"}],"version-history":[{"count":3,"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/posts\/1144\/revisions"}],"predecessor-version":[{"id":2329,"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/posts\/1144\/revisions\/2329"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/media\/1075"}],"wp:attachment":[{"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/media?parent=1144"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/categories?post=1144"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/tags?post=1144"},{"taxonomy":"yst_prominent_words","embeddable":true,"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/yst_prominent_words?post=1144"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}