{"id":2019,"date":"2021-06-14T09:15:57","date_gmt":"2021-06-14T08:15:57","guid":{"rendered":"https:\/\/www.ubuild.es\/montaje-de-vivienda-en-teo-segundo-dia-martes\/"},"modified":"2021-09-04T21:26:14","modified_gmt":"2021-09-04T20:26:14","slug":"montaje-de-vivienda-en-teo-segundo-dia-martes","status":"publish","type":"post","link":"https:\/\/www.ubuild.es\/en\/montaje-de-vivienda-en-teo-segundo-dia-martes\/","title":{"rendered":"Assembly of housing in Teo. Second day, Tuesday."},"content":{"rendered":"<p>First thing in the morning, the truck with the most components of the house arrives. After downloading it, we continue with the assembly. The first thing is to finish fitting the lower boards of the floor slab between the joists. Then we put the 15cm of rock wool insulation on the entire surface. Finally we put the upper boards on the joists. The upper board is a 22mm OSB which when screwed to the floor joists, a totally rigid resistant plane is achieved.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1992\" src=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-20.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-20.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-20-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-20-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-20-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-20-1536x864.jpg 1536w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-20-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-20-576x324.jpg 576w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-20-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-20-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p>After having placed all the upper floor boards, we have a perfectly level surface, to be able to continue safely mounting the rest of the components of the house.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1994\" src=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-21.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-21.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-21-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-21-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-21-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-21-1536x864.jpg 1536w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-21-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-21-576x324.jpg 576w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-21-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-21-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p>Now, although the columns are not perpendicular or attached to the slab, we begin to mount the roof beams on them. To be able to do it comfortably and safely, mount a couple of scaffolds on the floor slab.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1996\" src=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-22.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-22.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-22-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-22-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-22-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-22-1536x864.jpg 1536w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-22-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-22-576x324.jpg 576w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-22-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-22-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p>This house will have a gabled roof, so after placing all the perimeter beams, the lower bars of the trusses will be mounted.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1998\" src=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-23.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-23.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-23-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-23-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-23-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-23-1536x864.jpg 1536w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-23-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-23-576x324.jpg 576w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-23-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-23-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p>At the moment we have all the roof beams mounted on the pillars. Before continuing to place any other constructive element, we need to make sure that all the pillars are perfectly vertical.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-2000\" src=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-24.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-24.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-24-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-24-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-24-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-24-1536x864.jpg 1536w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-24-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-24-576x324.jpg 576w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-24-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-24-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p>In order to know this precisely, we use a water level that indicates when a pillar is completely vertical.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-2002\" src=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-25.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-25.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-25-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-25-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-25-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-25-1536x864.jpg 1536w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-25-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-25-576x324.jpg 576w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-25-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-25-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p>Once the column is perfectly vertical, we brace it so that it is fixed and does not lose its verticality.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-2004\" src=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-26.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-26.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-26-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-26-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-26-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-26-1536x864.jpg 1536w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-26-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-26-576x324.jpg 576w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-26-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-26-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p>This process must be carried out in all sections of the beams. The setting of one leg can influence the next leg. Therefore, this process must be repeated until all sections are perfectly vertical. Achieving this is essential so that later the rest of the construction elements fit together without any problem. In the photo above you can see how the upper structure of the house has been fixed on one of the sides.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-2006\" src=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-30.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-30.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-30-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-30-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-30-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-30-1536x864.jpg 1536w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-30-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-30-576x324.jpg 576w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-30-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-30-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p>Once the perfect verticality of all the pillars had been ensured, we began to fit the base boards of the fa\u00e7ade. Then we will screw the pillars to the floor and ceiling beams, and the boards to the pillars and to the floor and ceiling beams.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-2008\" src=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-27.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-27.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-27-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-27-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-27-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-27-1536x864.jpg 1536w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-27-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-27-576x324.jpg 576w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-27-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-27-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p>Now the structure and the closure form a totally solid and rigid set, the volume is almost non-deformable. When the interior partitions are assembled, the maximum rigidity of the volume of the house will be achieved.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-2010\" src=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-29-1.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-29-1.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-29-1-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-29-1-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-29-1-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-29-1-1536x864.jpg 1536w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-29-1-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-29-1-576x324.jpg 576w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-29-1-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-29-1-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p>We have already assembled the volume of the house. Today we are going to stop here and tomorrow we will begin with the assembly of the roof. Outside the house, all the components of the interior await, such as the interior modules of the fa\u00e7ade or the partition walls.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-2012\" src=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-31.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-31.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-31-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-31-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-31-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-31-1536x864.jpg 1536w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-31-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-31-576x324.jpg 576w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-31-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2021\/06\/1920-TEO-31-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p>To finish the description of the work done this second day, we leave two videos where the entire process is shown continuously.<\/p>\n<p><iframe loading=\"lazy\" title=\"Montaje vivienda Teo. Segundo d\u00eda, martes.mp4\" src=\"https:\/\/player.vimeo.com\/video\/562547354?dnt=1&amp;app_id=122963\" width=\"640\" height=\"360\" frameborder=\"0\" allow=\"autoplay; fullscreen; picture-in-picture; clipboard-write\"><\/iframe><\/p>\n<p><iframe loading=\"lazy\" title=\"Montaje vivienda Teo. Martes. Momentos.mp4\" src=\"https:\/\/player.vimeo.com\/video\/564847568?dnt=1&amp;app_id=122963\" width=\"640\" height=\"360\" frameborder=\"0\" allow=\"autoplay; fullscreen; picture-in-picture; clipboard-write\"><\/iframe><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Today is Tuesday, we continue showing the process of assembling the house. We continue with the structure, taking good care of the layout, which is the basis for everything to fit perfectly, as planned.<\/p>\n","protected":false},"author":1,"featured_media":1989,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[551],"tags":[1535,1210,1631,1632,716,1263,715,1630,717,1317,712,1627,1629,1264,1215,1318,1309,1238,1633,1628],"yst_prominent_words":[1126,601,364,1139,602,1447,257],"class_list":["post-2019","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction","tag-alberto-corral-en","tag-bioclimatic-architecture","tag-construction-of-wooden-houses","tag-construction-system","tag-ecological-architecture","tag-ecological-house","tag-green-architecture","tag-green-house","tag-mobile-house","tag-modular-architecture","tag-modular-house","tag-prefabricated-architecture","tag-premade-house","tag-self-construction","tag-sustainable-architecture","tag-sustainable-house","tag-tiny-house-2-en","tag-ubuild-en","tag-wooden-construction-system","tag-wooden-house"],"_links":{"self":[{"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/posts\/2019","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/comments?post=2019"}],"version-history":[{"count":4,"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/posts\/2019\/revisions"}],"predecessor-version":[{"id":2123,"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/posts\/2019\/revisions\/2123"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/media\/1989"}],"wp:attachment":[{"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/media?parent=2019"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/categories?post=2019"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/tags?post=2019"},{"taxonomy":"yst_prominent_words","embeddable":true,"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/yst_prominent_words?post=2019"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}