{"id":744,"date":"2018-12-02T11:59:02","date_gmt":"2018-12-02T10:59:02","guid":{"rendered":"http:\/\/www.ubuild.es\/?p=744"},"modified":"2021-09-04T21:21:40","modified_gmt":"2021-09-04T20:21:40","slug":"o-soutino-house-part-5","status":"publish","type":"post","link":"https:\/\/www.ubuild.es\/en\/o-soutino-house-part-5\/","title":{"rendered":"green house, o souti\u00f1o part 5"},"content":{"rendered":"<h2>wood machining center<\/h2>\n<p>In these two images we can see the wood machining center. It can repeatedly produce a <strong>complex geometric piece with a millimeter precision<\/strong>. This guarantees that beams and columns fit in and then joist, facade moduls, windows&#8230; etc, are in the position that are marked by the geometry of the structure.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-727\" src=\"http:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.00.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.00.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.00-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.00-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.00-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.00-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.00-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.00-750x422.jpg 750w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.00-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p>The wood machining center has got <strong>four\u00a0turning axes<\/strong>. This gives a great capacity to create complex forms that the machine can produce with precision. Naturally there are things that may limit and can condition the design. An example is depth of some tools, so you must be aware of it and adapt the design. In the photo below we can see some different tools that are changed <strong>automatically<\/strong> according to <strong>the ordered work<\/strong>.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-729\" src=\"http:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.01.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.01.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.01-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.01-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.01-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.01-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.01-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.01-750x422.jpg 750w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.01-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<h2>producing beams and columns<\/h2>\n<p>Here we can see the shapes of beams and colums. The most complex ones are those of <strong>union between beams<\/strong>, because they have <strong>various parallel planes in the three directions<\/strong> and they must <strong>fit in perfectly<\/strong>. The reasons for this complexity are: first, guarantee that the <strong>parallelism and perpendicularity<\/strong> are <strong>perfect<\/strong> when beams are fitted in, and second, the proper geometry of the union isolates and avoids\u00a0 water entering through joints.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-731\" src=\"http:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.1.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.1.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.1-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.1-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.1-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.1-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.1-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.1-750x422.jpg 750w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.1-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p>The <strong>complexity<\/strong> is produced <strong>in the factory<\/strong> and later <strong>mounting is\u00a0enormously easier<\/strong>, any person with patience and care can do it. Besides it is not necessary to have any special tool, a <strong>screwdriver is enough<\/strong> for all the mounting. The dimensions and weight of beams and columns can be handled by two or three people <strong>without using a crane<\/strong> at any moment.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-733\" src=\"http:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.3.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.3.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.3-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.3-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.3-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.3-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.3-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.3-750x422.jpg 750w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.3-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<h2>joists of the floor<\/h2>\n<p>In these pictures we can see joists of the floor. The <strong>geometry<\/strong> is to support an inferior panel with 15cm of <strong>isolation<\/strong>. In some joists you can see a <strong>longitudinal canal<\/strong> in the middle; this is the space <strong>for installations<\/strong>. The tops of joists lean directly on the beams and later they are screwed.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-735\" src=\"http:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.4.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.4.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.4-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.4-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.4-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.4-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.4-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.4-750x422.jpg 750w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.4-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-737\" src=\"http:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.6.jpg\" alt=\"\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.6.jpg 1920w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.6-300x169.jpg 300w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.6-768x432.jpg 768w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.6-1024x576.jpg 1024w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.6-350x197.jpg 350w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.6-1140x641.jpg 1140w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.6-750x422.jpg 750w, https:\/\/www.ubuild.es\/wp-content\/uploads\/2018\/12\/05.6-278x156.jpg 278w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p>Everything<strong> funtions as a huge meccano<\/strong> where <strong>beams and columns become a guide<\/strong>.\u00a0 Each piece of the construction has got its geometry in order to fit in and place the following element. Each piece fits millimetrically in the next one. <strong>No glue<\/strong> is used, pieces are simply screwed one with another.<\/p>\n<p>In the next part we will show how different elements of the house are produced. To be continued\u2026<\/p>\n","protected":false},"excerpt":{"rendered":"<p>While  the works continues on the land, the production of the components of the house has started in the factory. First the structure, it is the frame-work and over it the rest fo the construction elements are fitted in. To produce beams and colums is necessary to use wood machining center, because the precision of each element is measured in milimeters, in order to fit it perfectly. <\/p>\n","protected":false},"author":1,"featured_media":731,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[551],"tags":[1535,1210,1631,1632,716,1263,715,1630,1317,712,1638,1627,1629,1264,1215,1318,1309,1238,1633,1628],"yst_prominent_words":[805,784,804,644,787,799,793,604,803,796,797,794,223,798,777,776,780,781,786,769],"class_list":["post-744","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction","tag-alberto-corral-en","tag-bioclimatic-architecture","tag-construction-of-wooden-houses","tag-construction-system","tag-ecological-architecture","tag-ecological-house","tag-green-architecture","tag-green-house","tag-modular-architecture","tag-modular-house","tag-movil-house","tag-prefabricated-architecture","tag-premade-house","tag-self-construction","tag-sustainable-architecture","tag-sustainable-house","tag-tiny-house-2-en","tag-ubuild-en","tag-wooden-construction-system","tag-wooden-house"],"_links":{"self":[{"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/posts\/744","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/comments?post=744"}],"version-history":[{"count":15,"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/posts\/744\/revisions"}],"predecessor-version":[{"id":1164,"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/posts\/744\/revisions\/1164"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/media\/731"}],"wp:attachment":[{"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/media?parent=744"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/categories?post=744"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/tags?post=744"},{"taxonomy":"yst_prominent_words","embeddable":true,"href":"https:\/\/www.ubuild.es\/en\/wp-json\/wp\/v2\/yst_prominent_words?post=744"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}